Tuesday 22 October 2019

Greens over seeding work 2019

The course has been closed this week for some turf renovations on greens. Pot seeding work was carried out to introduce large quantities of fescue seed into the ground. This was brushed in by hand prior to a pass with the vredo disc seeder to connect the small seed pots. A heavy dressing of sand was applied and worked into the turf surface with a rubber drag mat. An application of seaweed has been applied to aid recovery from the aeration work.