Thursday 21 December 2017

Rough Scarifying Work

Work has begun to remove more organic material from the turf surface in the rough areas. The scarifyer blades are set to 15mm depth to tear out thatch and dead grass. Cutting blades are trimming the grass at the same time which is then collected in the hopper. This will further thin the rough areas for next season. Another pass will be done in early March before the grass starts to grow.


Monday 4 December 2017

Hollow coring work on approach areas. 

Coring work was carried out on some of the softer approaches to remove some organic matter. Approaches at 2,6,8,9,10,16th will be done, with a heavy sand dressing afterwards worked into the holes.