The course has been closed this week for some turf renovations on greens. Pot seeding work was carried out to introduce large quantities of fescue seed into the ground. This was brushed in by hand prior to a pass with the vredo disc seeder to connect the small seed pots. A heavy dressing of sand was applied and worked into the turf surface with a rubber drag mat. An application of seaweed has been applied to aid recovery from the aeration work.
Tuesday, 22 October 2019
Tuesday, 7 May 2019
Solar Panel Installation
Recently we had installed 102 solar panels to reduce our energy costs at our facility at Links Farm.Rising costs have driven this project and we will see an instant reduction in energy bills especially during the summer months when the irrigation system is used every day. This is another great investment by the club in our facility at the club.
Subscribe to:
Posts (Atom)