Work is underway to lay a new drainage system under this fairway. A new main drain was installed with several laterals across the fairway at 5.5mt centres. There is a seam of thick gray clay about 800mm below the surface that impedes natural drainage. The new drains have been laid to collect water before it hits the clay layer taking it into the main and natural ditch on the right of the fairway.
Monday, 19 November 2018
7th fairway drainage project.
Wednesday, 7 November 2018
Putting green re- build
Work is on going to remove the old root zone from the putting green. The soil was very compacted in the top 400mm which was inhibiting drainage and grass growth.