Friday, 27 November 2015
Wednesday, 25 November 2015
Work being done on the hollows to the right of the 3rd green. After recent construction these hollows have settled and are now proving difficult to cut and maintain. We have stripped the turf and will up fill the low areas with new root zone. This will smooth out the contours and make maintenance easier. We have added around 12inches to the bottom of the hollows to re contour them.
Thursday, 12 November 2015
Tuesday, 10 November 2015
Hollow tining work being carried out on greens 2,3,4,12 to remove some organic matter from the turf surface. As these greens were lifted and re-laid last year we have not done as much aeration work to them over the past two years. A Humic acid product will be applied into the holes which will give some added nutrient to the sandy root zone. The core diameter was 16mm which has removed a lot of material from the surface.
Friday, 6 November 2015
Monday, 2 November 2015
Air 2 g 2 machine working on the putting green. This machine penetrates the ground to 11 inches and the shatters the underlying hard pan using compressed air. The tines have a series of holes for the air to be released. This will create several fissures in the soil that will allow for better drainage and also supply the roots with some much needed oxygen. The beauty of this machine is there is very little disturbance to the surface. A single roll with the turf iron returns the surface to normal.
Subscribe to:
Posts (Atom)